
Grade 12th pass9 grade maths
If 6 men and 8 boys can do a piece of work in 10 days, while 26 men and 48 boys can do the same work in 2 days, then what is the time taken by 15 men and 20 boys in doing the same type of work?
A) 3 days
B) 4 days
C) 5 days
D) 6 days
If 6 men and 8 boys can do a piece of work in 10 days, while 26 men and 48 boys can do the same work in 2 days, then what is the time taken by 15 men and 20 boys in doing the same type of work?
A) 3 days
B) 4 days
C) 5 days
D) 6 days




