
Grade 11Algebra
A man finished a job in 5 days. On the first day he finished (1/m) of the job. On the 2nd day he finished (1/n) of the job left. On 3rd day, he finished (1/m) of the job left, and on the 4th day (1/n) of the job left. On the last day (1/4) of the job was left to be done. If (m,n belongs to N) and n>m. Find m and n.
A man finished a job in 5 days. On the first day he finished (1/m) of the job. On the 2nd day he finished (1/n) of the job left. On 3rd day, he finished (1/m) of the job left, and on the 4th day (1/n) of the job left. On the last day (1/4) of the job was left to be done. If (m,n belongs to N) and n>m. Find m and n.





