A manufacturer produces nuts and bolts. It takes 1 hours of work on machine A and 3 hours on machine B to produce a package of nuts. It takes 3 hours on machine A and 1 hour on machine B to produce a package of bolts. He earns a profit of Rs 17.50 per package on nuts and Rs 7 per package of bolts. How many packages of each should be produced each day so as to maximize his profits if he operates his machines for at most 12 hours a day? From the above as a linear programming problem and solve it graphically.
A manufacturer produces nuts and bolts. It takes 1 hours of work on machine A and 3 hours on machine B to produce a package of nuts. It takes 3 hours on machine A and 1 hour on machine B to produce a package of bolts. He earns a profit of Rs 17.50 per package on nuts and Rs 7 per package of bolts. How many packages of each should be produced each day so as to maximize his profits if he operates his machines for at most 12 hours a day? From the above as a linear programming problem and solve it graphically.